Complete Organic Waste Gas Treatment System

Complete Organic Waste Gas Treatment System

Angran has been producing complete organic waste gas treatment systems since 2018. Our factory in Botou, Hebei, spans 4,000 square meters and employs 20 skilled workers. We have an experienced R&D team to provide tailored solutions.
This turnkey system handles everything from gas collection to clean exhaust, including hoods, pipes, pre-treatment, main treatment unit, and fan.
Add To Inquiry
Send Inquiry
Description
Technical Parameters

One Solution for All Your VOC Problems

 

Angran has been producing complete organic waste gas treatment systems since 2018. Our factory in Botou, Hebei, spans 4,000 square meters and employs 20 skilled workers. We have an experienced R&D team to provide tailored solutions.

This turnkey system handles everything from gas collection to clean exhaust, including hoods, pipes, pre-treatment, main treatment unit, and fan. For the main treatment, you can choose carbon adsorption, catalytic oxidation, UV light, wet scrubber, or a combination of these. The system is designed for your specific exhaust, whether from painting, printing, plastic injection, or chemical plants. Cleaning efficiency is high, emissions meet environmental standards, and workshop air quality improves significantly. OEM and ODM support is available. Minimum order is 1 piece, and free samples are offered. Non-worn parts have a 1-year warranty.

e7c89667b6fd0f9391c606da50439dee

 

Key Data for VOC Treatment

 

Item

Description

Included Parts

Hoods, pipes, pre-treatment, main unit, fan

Main Treatment Options

Carbon adsorption / Catalytic oxidation / UV light / Wet scrubber / Combined

Pre-Treatment

Dry filter / Water curtain, stops paint mist and dust

Safety Features

Explosion-proof design, flame arrestor, explosion vent

Applications

Paint shops, printing, plastic injection, chemical, rubber, medicine

 

Custom Design for Complex Gas Mixtures

 

For gas streams containing multiple chemicals, we recommend a combined process. For example, dry filter plus carbon plus catalytic oxidation provides the most complete cleaning.

 

Our team provides free design and custom builds. Every unit is checked before packing, and third-party inspection is welcome. A dedicated after-sales team supports you throughout:

Before Sale: Confirming your gas type, concentration, and volume.

During Production: Sending progress updates and photos.

After Sale: Resolving any issues quickly.

 

Shipping is FOB or EXW. Payment terms are 30% deposit and 70% balance; custom orders require 50% deposit. Bulk orders receive discounts. We accept RMB and USD. Small units ship in wooden cases; larger systems use protective film. Standard delivery is 7–10 days; custom builds take 7–15 days. We produce 60 machines per month.

 

Common Question:

  • "Can you handle chlorinated VOCs?"

Yes, we use special materials for aggressive gases.

Contact us for a free complete organic waste gas treatment system design and quote.

 

 

Hot Tags: complete organic waste gas treatment system, China complete organic waste gas treatment system manufacturers, suppliers, factory, Activated Carbon Catalytic Combustion Integrated Equipment, Grinding Dust Removal Workbench, Industrial Dust Extraction Workbench, Industrial Dust Treatment Units, VOC Waste Gas Treatment Systems, Welding Fume Purifier

Send Inquiry
Send Inquiry